Async DAG

Crate Crates.io API

async_dag is an async task scheduling utility.

When async tasks and their dependencies can be described by a DAG, this crate ensures the tasks are run at maximum posiible parallelism.

Example

Say there are several tasks which either produces an i32 or sums two i32s, and they have dependency relationship described by following graph,

      7
     / \
    3   \
   / \   \
  1   2   4

which means there are three tasks producing value 1, 2 and 4, a task summing 1 and 2 to get 3, and a task summing 3 and 4 to get the final output, 7.

A casual developer may write

let _3 = sum(_1.await, _2.await).await;
let _7 = sum(_3, _4.await).await;

Above code is inefficient because every task only begins after the previous one completes.

A better version would be

let (_1, _2, _4) = join!(_1, _2, _4).await;
let _3 = sum(_1, _2).await;
let _7 = sum(_3, _4).await;

where _1, _2 and _4 run in parallel.

However, above scheduling is still not optimal because the summing of _1 and _2 can run in parallel with _4.

To acheive maximum parallelism, one has to write something like

let _1_2 = join!(_1, _2);
let (_3, _4) = select! {
    _3 = _1_2 => {
        (_3, _4.await)
    }
    _4 = _4 => {
        let (_1, _2) = _1_2.await;
        (sum(_1, _2).await, _4)
    }
}
let _7 = sum(_3, _4).await;

The code is quite obscure and the manual scheduling quickly becomes tiring, if possible at all, with a few more tasks and dependencies.

With async_dag, one can write

use async_dag::Graph;

async fn sum(lhs: i32, rhs: i32) -> i32 { lhs + rhs }

async fn run() {
    let mut graph = Graph::new();
    // The closures are not run yet.
    let _1 = graph.add_task(|| async { 1 } );
    let _2 = graph.add_task(|| async { 2 } );
    let _4 = graph.add_task(|| async { 4 } );

    // Sets `_1` as `_3`'s first parameter.
    let _3 = graph.add_child_task(_1, sum, 0).unwrap();
    // Sets `_2` as `_3`'s second parameter.
    graph.update_dependency(_2, _3, 1).unwrap();

    // Sets `_3` as `_7`'s first parameter.
    let _7 = graph.add_child_task(_3, sum, 0).unwrap();
    // Sets `_4` as `_7`'s second parameter.
    graph.update_dependency(_4, _7, 1).unwrap();

    // Runs all the tasks with maximum possible parallelism.
    graph.run().await;

    assert_eq!(graph.get_value::<i32>(_7).unwrap(), 7);
}

use futures::executor::block_on;
block_on(run());

Fail-fast graphs

TryGraph can be used if the user wants a fail-fast strategy with fallible tasks.

It aborts running futures when any one of them completes with a Err.